Customization: | Available |
---|---|
Certification: | ISO, CCC, CE |
Surface: | Smooth |
Still deciding? Get samples of US$ 10/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction of prestressed concrete steel strand (steel strand for mine anchor cable). It will be completed and put into operation in January 2022. Designed annual output of 300,000 tons, advanced production equipment, mature technology, production equipment mainly includes two sets of LW9-1200 type wire drawing unit, l set of SKIP-1x19 type twister unit. Can produce 1*2, 1*3, 1*7, 1*19 and other types of steel strand, production strength level up to 1860MPa diameter up to 28.6mm, and supporting mature testing equipment, 10T, 30T, 200T universal testing machine each, bending testing machine, relaxation testing machine each. 7 coal safety certificates have been obtained.
Structure | Standard | Nominal diameter |
Tolerance on Diameter |
Nominal Area of Section |
Weight of strand |
Tensile Strength, Rm |
Minimum Breaking load,Fm | 0,2% proof force , Fp0.2 | Elongation Lo=500mm, Agt | Curvative of strand | Lay Length | The Relaxation at 1000h (initial load to 70% of nominal max load ) (r/%) Not more than | |
(mm) | (mm) | (mm2) | (kg/1000m) | (N/mm2) | KN | KN | (%) | mm | mm | ||||
1*19S | GB/T 5224-2014 | 20.3 | +0.40,-0.15 | 271 | 2149 | 1770 | 480 | 422 |
|
25 | (12-18)d | 2.5 | |
1*19S | GB/T 5224-2014 | 20.3 | +0.40,-0.15 | 271 | 2149 | 1810 | 491 | 432 |
|
25 | (12-18)d | 2.5 | |
1*19S | GB/T 5224-2014 | 20.3 | +0.40,-0.15 | 271 | 2149 | 1860 | 504 | 444 |
|
25 | (12-18)d | 2.5 | |
1*19 | JIS3536 | 20.3 | +0.60,-0.25 | 270.9 | 2149 | 495 | 422 |
|
25 | (12-18)d | 2.5 |
Zibo Aike Industrial and Mining Machinery Co., Ltd. is located in Pu Weng hometown of central Shandong Province, which has a rich history. Founded in 1986, after 36 years of hard work, it has grown into a comprehensive mine service provider integrating research, production and marketing of mining products, auxiliary transportation and professional services of environmental protection management.
Q1: What is the minimum order quantity?
A: Usually our minimum order quantity is one container, but some items are different, please contact us for details.
Q2: What are your payment terms?
A: We usually accept sight telegraphic transfer, letter of credit, if you prefer other payment terms,
Please discuss.
Q3: What is your delivery time?
A: For products in stock, we can ship within 7 days after receiving the deposit. For custom orders, the production time is 15-30 working days after receiving the deposit.
Q4: How do you guarantee your products?
A: Mill test certification is provided with shipment and we also accept and support third party inspection.
Q5: Will all fees be clear?
A: Our offer is easy to understand and does not incur any additional costs.